18 hours closed road, obscenity of inferior engineer

0
274

Traffic Jam: 18 hours closed road, obscenity of inferior engineer. Due to the debris near Chadanu on Kalsi Chakrata motorway, it was closed for 18 hours. JCB had to remove the debris of the road in the morning. But the villagers did not allow the wreck of the village to be buried under the wreckage of the garden.

Traffic Jam: 18 hours closed road, obscenity of inferior engineer

The villager first demanded compensation. Later, the Revenue Police arrived at the spot and started deleting debris. On the other hand, the people of the inferior engineer, surrounded by the people, surrounded them and falsely falsely recited.

In the meantime, long queues of hundreds of vehicles were on both sides of the road. On the Kalsi Chakrata motorway on Wednesday night, at 9 o’clock on the hill near Chantu, landslides came to a massive debris. The route completely closed for traffic. On the morning Kalsi Chakrata motorway, the drivers informed the phone to open the route to Lonivi. JCB on the spot reached the debris at 6 o’clock in the morning. But Chapantu resident Jagat Ram’s mango plant and gaushala were buried under the grip of debris.

Jagat Ram JCB stopped working debris from machine. Said that first he should be compensated for losses. Due to the protest of Jagatram, the removal of debris did not begin long enough. During this time, there was no casualty between passengers and Jagat Ram. At around ten o’clock, revenue deputy commissioner Kamlesh Sharma and homeguard started to work forcibly, but Jagatram did not start work. Tehsildar Shakti Prasad Uniyal, who reached the spot on eleven o’clock, said that the land which rural Jagat Ram is talking about is barren land.

Uniyal started work on the removal of debris by forcibly JCB. Near the 12 o’clock the Lonavi’s inferior engineer also reached the spot. Angry drivers and passengers surrounded him and fiercely killed. Angry crowd came down on a scuffle with the inferior engineer. Later the people calm down after the tehsildar and revenue deputy inspector explained it. The route opened at around two o’clock. First, he should be compensated for losses. Due to the protest of Jagatram, the removal of debris did not begin long enough. During this time, there was no casualty between passengers and Jagat Ram.

Read Also: If the child is eating more and become fat, then can be cause cancer !

Follow Us On Facebook & Twitter.